Squannacook Greenways logo

Construction funded by all our donors and:

Donor organizations logos

MBTA Valuation Maps

Below are links to the 14 valuation maps that cover the Greenville Spur of the Fitchburg Line, the spur that contains the Squannacook River Rail Trail. These maps can be found at the Massachusetts Registry of Deeds, and are referenced from the MBTA's main deed which may be found in the South Middlesex Registry of Deeds, Book 13156, Page 034, dated Feb 16, 1977.

Maps 6-10 cover the existing Squannacook River Rail Trail. Map 5 covers the planned extension into Groton, and maps 10-14 cover the planned extension to the New Hampshire line.

Click on any link to see a jpeg of that valuation map. The valuation maps are each around 10 MB in size.

 

Number Mileage from Ayer at end of map Description
One 2.06 Ends just north of Nashua River, Ayer/Groton line
Two 2.95 Groton State Forest
Three 3.97 West Groton Center
Four 4.95 Hollingworth and Vose
Five 5.95 Along Townsend Road
Six 6.95 Townsend/Groton line
Seven 7.95 Just before South Street
Eight 8.95 Harbor Pond/Old Meetinghouse Road
Nine 9.95 Approaching Townsend Center
Ten 10.95 Depot, Route 13, first trestle
Eleven 11.95 Route 119 crossing, second trestle
Twelve 12.95 Dudley, Old Turnpike
Thirteen 13.45 Townsend State Forest
Fourteen 14.08 New Hampshire border